Stripped the last of the plastic film off the floor panels and started final cleaning to prep for paint. Did a little more work on the edges. Made a plan for cargo tie downs in the baggage compartment. Either eye-bolts in place of floor fasteners, clamping the floor and the steel frame tab in between two nuts, or flat pastel plates bolted down in the same fashion, with a tab bent up into the cargo space with a hole in it to accept a rope, chain link, or binged. Looking for 10-24 machine eye bolts. Can use hardware store variety or go with option B with AN-3A bolts and nuts. Front can be captured between the rear seat frame and the floor with an 5 bolts.