Project: pbruce   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Patrick Bruce   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:593
Total Flight Time:5
Start/Last Date:Mar 02, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=pbruce

Home or Last Project Picture

Mar 30, 2022     Floor panels - (5 hours) Category: Fuselage
Stripped the last of the plastic film off the floor panels and started final cleaning to prep for paint. Did a little more work on the edges. Made a plan for cargo tie downs in the baggage compartment. Either eye-bolts in place of floor fasteners, clamping the floor and the steel frame tab in between two nuts, or flat pastel plates bolted down in the same fashion, with a tab bent up into the cargo space with a hole in it to accept a rope, chain link, or binged. Looking for 10-24 machine eye bolts. Can use hardware store variety or go with option B with AN-3A bolts and nuts. Front can be captured between the rear seat frame and the floor with an 5 bolts.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.